Ply CalanderToyo Tire

  • Not-remote
  • Full-time
  • Total comp
    Expected total yearly pay with bonus and equity at target, including any base pay.
  • Salary
  • White, GA

Job Summary

The Preparation PLY Technician is responsible for producing high quality tire components used in the construction of tires while exercising every aspect of safety and quality.  The effective execution of the defined manufacturing systems is required and includes compliance with ISO regulations, compliance with TPM responsibilities, TQM guidelines & concepts, EHS policies & procedures, productivity measures, cost containment, lean principles, and continuous improvement.

 

The technician, as a team member, must always exhibit professional conduct and lead by example to foster team development and cooperation among any and all other team members. 

 

Setup and thread ply calendar

Setup unwinding station, seam splice fabric, wind    fabric through festoon, adjust tensioning devices, setup weft cutting rollers & comb, setup edge cutter, setup cooling station, and setup winding station

Startup ply machine

Start extruders

Change out material cassettes

Monitor control panels/screens, equipment and input of raw material.

Set-up of new rolls for next run cycle. (Every 2 hours)

Keep sheet stock rubber stocked at extruders. (As needed)

Keep rubber fed into extruders. (As needed)

Inspect, measure and stage finished product. (Every cassette)

Visual Inspection of ply at calendar rolls. (3 times per cassette)

Clean picking area and rollers. (Once per shift)

Sweeping and general housekeeping. (Once per shift or as needed)

Empty vacuum bags (Once per shift)

Help other operators as needed

Cover each other for breaks

Valar Atomics
NRB
Maddox Transformers
Patriot Mobile
University of Dallas
MxM News
Patmos
Bahnsen Group